Quality control

Quality first, with cost treated as an engineering decision.

A reliable CKD program begins with the right specification, approved samples and a controlled BOM before inspection and packing take place.

Display policy

New panels only

No refurbished, recycled or used display panels enter the kit.

Specification

Approved BOM

Component models, quantities and options are fixed for the approved size and build.

Pre-production

Sample confirmation

Samples and product requirements are confirmed before batch production.

Packing

Protection by configuration

Foam, bags, tapes, cartons and pallets are selected for the size and export method.

A lower purchase price is not a saving when it creates a quality or compatibility problem.
Our project approach

When the customer specifies a panel brand, we build around that requirement. When the brand is open, we compare a cost-efficient new-panel option against the product’s target market, picture requirement, mainboard compatibility and landed cost.

Discuss a quality-first configuration

Production readiness

Inspection is tied to the production step.

Incoming components, molded parts, assembly items and the final kit each have a defined role in the approved production plan.

01

Incoming components

Panel, mainboard, optical materials and purchased components are checked against the approved specification.

02

Molded & structural parts

Front and rear housings, frames, terminals and supports are checked for fit and appearance.

03

Assembly validation

The selected panel, board, backlight, controls and housing are assembled and reviewed as a matched set.

04

Kit & packing check

Component quantities, labels, protection and packing are checked before loading.